A Senior with decades of experience on the supplier side of the power plant business supported Axpo in developing a reserve power plant for a federal tender. He brought his entire learning curve into the project, from technology selection to the EPC contract, and helped Axpo win the award and sign the contract.
Background
In July 2023, the Swiss Federal Office of Energy (SFOE) launched a tender for reserve power plants: capacity that is to secure Switzerland’s electricity supply in the event of an energy shortage in Europe, mainly during the winter months. For Axpo, the tender came as no surprise. The topic had been under discussion for some time, Axpo had carried out an internal feasibility study, and a strategic partnership for a site was already in place.
What was missing was hands-on implementation experience. The most recent gas-fired power plant in the Axpo fleet had been built some 15 years earlier. There were people in the company who knew the gas turbine world from their earlier careers, but they were fully committed to their own projects. And Axpo did not want to hand the project to an external firm as a package: it was too strategic and too custom-made for that. The project had to be run in-house, with fast access to additional, highly competent resources.
Andreas Burri, Head of Asset Management and Business Development Gas-fired Power Plants at Axpo, knew Fritz Megerle from a budget offer the year before, when Fritz was still working on the supplier side. When he learned that Fritz had left his former employer, he got in touch. There was one small catch: Fritz had a five-week trip to the United States already booked, right at the start of the mandate. For Axpo, that was manageable. The mandate began on August 1, 2023. Originally planned for six months, it was extended several times and ran until the end of April 2026, when the contract between Axpo and the SFOE was signed.
Why a Senior?
The immediate question for Andreas Burri was how to set up and negotiate a project and an EPC contract of this magnitude: What do you need to watch out for in this segment of the business, and how do you address your requirements to the other side of the table? Every project is new in some way, and this one was new for Axpo in Switzerland. But it was not something no one had ever done before. That is where a Senior comes in: someone who has done something very similar, in this case from the opposite side.
For Fritz Megerle, the mandate meant changing sides. He had worked with power plants for decades, but always as a supplier of gas turbines and turnkey plants. Developers had been his customers. Fuel availability, the site, grid connection, water supply, permits, and local political sensitivities: as a supplier, he had had to take these into account, but they were ultimately the developer’s problem. Now they were his.
“As a supplier, you know what the customer wants, even if you can’t always give it to them. Now I saw the same situation from the other side, with different constraints and a different dynamic. And when I sit on the other side, I try to get the best for that side. A contract is a contract: you have to write into it what you want, and you have to understand the risks.”
Fritz Megerle, Senior
“When you bring in a Senior, you bring the entire learning curve into the project. Fritz knew exactly what we were talking about. I didn’t have to explain to him what a power plant or an EPC contract is. He could tell me better than I could tell him. It was fascinating how quickly we got going.”
Andreas Burri, Head of Asset Management and Business Development Gas-fired Power Plants, Axpo
Approach
The collaboration was set up without a big script. Roles and responsibilities were defined in a few keywords: this is Fritz’s area, this is handled by a colleague, this is Andreas’s responsibility. A project meeting every week, with Andreas Burri as the decision-maker. Within the five-person project team, Fritz Megerle took the lead on the technical and commercial core of the bid: reviewing the tender, specifying the technology, running the tender for and selecting the EPC contractor, and drafting and negotiating the EPC contract, including delivery time, price, and terms and conditions. He also worked on fuel supply, grid connection, water, permitting requirements, site logistics, and the schedule. Every external interface had to be fixed with a contract or a term sheet before the bid was submitted.
After submission, the work continued: clarifications with the SFOE on contract, schedule, price, and technical conditions, several amendments, and finally the negotiation of the contract between the SFOE and Axpo. The project needed frequent adaptation to political, technical, and regulatory changes.
“Fritz was always thinking one or two steps ahead: ‘You need to watch out for this. Do we have it on the radar yet?’ That was extremely valuable. We had experienced people in the project, but each in their own field. Fritz understood the undertaking as a whole and how everything is connected.”
Andreas Burri, Head of Asset Management and Business Development Gas-fired Power Plants, Axpo
What made it work was mutual respect, trust, and transparent communication, combined with a speed of decision-making that Fritz Megerle had rarely experienced.
“I have to sing Axpo’s praises: when you need a decision, it happens fast. You don’t have to go around in circles before you get one. We went from zero to a hundred in a matter of days.”
Fritz Megerle, Senior
Result
Axpo was successful in the auction, received the award from the SFOE, and concluded the contract for the reserve power plant. That is the primary result. The project can now move into execution, subject to the permitting process.
Beyond the award, the team gained something that is harder to measure: the overview of how the essentials of a successful power plant project fit together, the confidence of having someone on board who has been through similar situations, and the habit of looking one step ahead. When the environment changed yet again, the question was never whether to continue, but what the options were and how to get the project back on course and create something that works for the client and all the stakeholders.
“You have to put yourself not only in Axpo’s position, but in the position of the client: What does he need? What is acceptable, what isn’t? What can the partners on site do? That requires constant re-evaluation, a lot of creativity, and a wealth of experience. For me, that was part of the project’s success.”
Andreas Burri, Head of Asset Management and Business Development Gas-fired Power Plants, Axpo
Perspectives
Client’s Perspective
“What mattered was a lot of mutual respect and a lot of trust. We knew what we could rely on Fritz for, and we communicated clearly and transparently with each other. That worked very well. For things we have never done ourselves, but others have in a similar form, I see great value in a Senior. You get to the point much faster and avoid detours you would otherwise take simply because you don’t know the territory. Seniors with their wealth of experience help you navigate situations that are new to you, but similar to something they have been through.”
Andreas Burri, Head of Asset Management and Business Development Gas-fired Power Plants, Axpo
Senior’s Perspective
“A project is not an Olympic discipline where taking part is everything. Winning the award and then getting the contract done was the professional highlight. The other highlight was that Andreas asked me in the first place. That is a real sign of appreciation. And it was fun. There wasn’t a single day when I thought, ‘I have to go to Axpo now.’ I always came in gladly, had a coffee, and discussed the project. It was a great time, and I even got paid for it. It’s like having your hobby paid for.”
Fritz Megerle, Senior
For the Senior himself, a mandate like this is more than just a project: the experience of an entire career is needed, valued, and appreciated. And seeing the business you know so well from the other side of the table is an enriching experience in itself.
Axpo is Switzerland’s largest producer of renewable energy and an international leader in energy trading and in the marketing of solar and wind power. The Axpo Group employs around 7,500 people, about 5,000 of them in Switzerland, and generated total revenue of CHF 7.4 billion in the 2024/25 fiscal year. Axpo is owned by the cantons and cantonal utilities of northeastern Switzerland.
When your company faces something it hasn’t done in a long time, but others have in a similar form. Axpo had the strategy, the site, and a strong team, but the hands-on experience of developing a gas-fired power plant and negotiating an EPC contract was not available in-house. A Senior brings the entire learning curve with him, so the team gets to the point faster and avoids detours.
Yes, and it is a particular advantage. Fritz Megerle knew what Axpo needed from the suppliers and how to address them so that they would offer something Axpo could actually use. He knew where the risks sit in an EPC contract and how the management on the other side thinks. A contract is a contract: you have to write into it what you want.
In days, not months. Roles and responsibilities were defined in a few keywords, a weekly project meeting provided the structure, and decisions were made fast. The basis was mutual respect, trust, and transparent communication. In Fritz Megerle’s words: from zero to a hundred in a matter of days.
Experience pays off. Several amendments were required because political, technical, and regulatory conditions kept changing. Each time, the question was what the options were and how to get the project back on course, from the perspective of Axpo as well as that of the federal government as the client. The result: Axpo won the award and signed the contract.